(Dale G. Young/Detroit News via AP, file)
NUTS, BOLTS AND fittings are ready to be added to the east leg of the pipeline near St. Ignace as Enbridge Inc. prepares in June 2017 to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich.